Supply Chain & Material Traceability

Real-time freight status, circular provenance, and material passports.

Track structural steel, low-carbon concrete, and prefabricated modules from certified mills to active tower cranes with full chain-of-custody verification.

Tracked Shipments

64 ActiveAcross 9 European supply corridors

In-Transit Value

$31.2M100% digital provenance verified

Schedule Lead Variance

-1.8 DaysAhead of baseline delivery pace

Green Freight Ratio

76.4%Rail & electric corridor routes
Green Logistics PartitionFreight decarbonization
Electrified Rail Corridor14g CO₂/t-km
Primary cross-border backbone44%
Multimodal Short-Sea + Rail22g CO₂/t-km
Low-impact maritime routing29%
Euro-6 / EV Heavy Truck68g CO₂/t-km
Last-mile site access only27%
Rail Over Road Advantage-78% CO₂ emissions vs standard diesel highway transport
Active Procurement & Material PipelineEnd-to-end telemetry
🚂Low-Carbon Structural Steel (SSAB Zero)

PO-7741 • SSAB Nordic Steel AB (Oxelösund, SE) → Aurora Tower, Madrid

Quantity420 tonnes
Recycled95%
Carbon Load34.2 tCO₂
ETASep 04
In Transit
🚛Recycled Aggregate CEM-III Eco-Concrete

PO-7788 • Holcim ECOPact Iberia (Sagunto, ES) → Harbor Clinic, Valencia

Quantity1,200 m³
Recycled48%
Carbon Load18.5 tCO₂
ETADelivered
On Site
⚡Triple-Glazed Low-E Acoustic Facade Panels

PO-7802 • Saint-Gobain Glass (Mannheim, DE) → Aurora Tower, Madrid

Quantity180 units
Recycled35%
Carbon Load12.4 tCO₂
ETASep 12
In Production
🚂Engineered Glulam Cross-Laminated Timber

PO-7820 • Stora Enso Wood (Ybbs an der Donau, AT) → Sol Yard Logistics, Seville

Quantity340 m³
Recycled100%
Carbon Load4.2 tCO₂
ETASep 02
Customs
🚛Bifacial Solar PV Rooftop Modules (480 kWp)

PO-7844 • Enphase Renewable Tech (Porto, PT) → Sol Yard Logistics, Seville

Quantity1,120 panels
Recycled62%
Carbon Load8.9 tCO₂
ETASep 18
Ordered